Rheticus Safeway – 400 KM2

Estimated cost: 400CRper 400 KM² Operators calculate the cost of the service based on the area of interest

Periodic reporting of the stability of road infrastructure such as roads, railways, and airports. The segmented infrastructures are classified on the basis of speeds and acceleration measured over time.

More details can be found in the Technical Specification document accessible by using the following link:

https://www.rheticus.eu/wp-content/uploads/2022/10/pkm106-144-1.1_Rheticus_Safeway_Technical_Specifications.pdf

 

 

 

 

 

 

 

 

Additional info
Full description
Note
The standard roads/bridges layer is based on OSM (Open-Street-Map). A different roads/bridges layer in geopackage, shapefile, or kml format (e.p.s.g 4326) can be provided at the service activation request.