Rheticus Building Check

Estimated cost: 100CRper 100 KM² Operators calculate the cost of the service based on the area of interest

Periodic reporting of the stability of buildings, classified on the basis of the stress level associated with measurements of displacements and accelerations over time.

Additional info
Full description