Rheticus Safeland – 400 KM2

Estimated cost: 400CRper 400 KM² Operators calculate the cost of the service based on the area of interest

Periodic reporting of land stability through segmentation of the area of interest and automatic classification of each individual portion based on measured trends and anomalies.

More details can be found in the Technical Specification document accessible by using the following link:

https://www.rheticus.eu/wp-content/uploads/2022/10/PKM106-247-v2_Rheticus_Safeland_Technical_Specifications.pdf

 

 

 

 

Additional info
Full description